Information about attachments to streetlights.

We recognise that attachments can enhance areas and promote seasonal or specific activities and will work with any public body and help them obtain the necessary permissions to install attachments to streetlights.

Any new application will need to follow a formal process to ensure that the applicant is complying with the requirements, in relation to:

  • the suitability of the column (may require structural testing)
  • the energy used by the attachment, which must be paid for by the applicant (will require a Meter Point Administration Number MPAN Certificate and an energy supplier)
  • the qualifications of the contractor installing the attachment (if electrical, for example, a festive decoration), contractors must be a member of the Highway Electrical Registration Scheme (HERS)
  • the way it is attached (booking road space and any required traffic management)
  • the duration of the attachment, no permanent attachment will be permitted and you will be required to provide a start and end date within your application

To assist you, please download the attachments to streetlights flow chart pdf and the lighting column attachments application form, excel document. The flow charts will guide you through the process and the excel document has been designed to allow the passing of key information to the streetlighting team and for them then to return it to you with a staged permission. This then, will allow you to proceed to the next steps, ending in formal approval being granted.

It鈥檚 important that you take some time to familiarise yourself with the process and the information requirements that these documents contain.

Download:

Structural testing

We cannot advise you to engage a specific structural testing company, however historically, we have worked with KIWA:

Energy use

We cannot permit any electrical attachment to a streetlight without a valid Meter Point Administration Number (MPAN) Certificate being evidenced. The energy being used by your attachment must be accounted for and paid by you. You are strongly advised to confirm this process is complete before committing to paying for any required structural testing.

Please note that these requirements exclude flags and bunting.

If you require any assistance in completing the required spreadsheet, or have queries, please send them to: